متجر الطلاء
Pony Luxury Coating Pony L11000 (11x5x5)

سنة الصنع
٢٠٢٥
الحالة
جديد
الموقع
Würzburg ألمانيا
متجر الطلاء Pony Luxury Coating Pony L11000 (11x5x5)
متجر الطلاء Pony Luxury Coating Pony L11000 (11x5x5)
متجر الطلاء Pony Luxury Coating Pony L11000 (11x5x5)
متجر الطلاء Pony Luxury Coating Pony L11000 (11x5x5)
متجر الطلاء Pony Luxury Coating Pony L11000 (11x5x5)
متجر الطلاء Pony Luxury Coating Pony L11000 (11x5x5)
متجر الطلاء Pony Luxury Coating Pony L11000 (11x5x5)
more Images
Pony Luxury Coating Pony L11000 (11x5x5)
Pony Luxury Coating Pony L11000 (11x5x5)
Pony Luxury Coating Pony L11000 (11x5x5)
Pony Luxury Coating Pony L11000 (11x5x5)
Pony Luxury Coating Pony L11000 (11x5x5)
Pony Luxury Coating Pony L11000 (11x5x5)
Pony Luxury Coating Pony L11000 (11x5x5)
عرض الصور
عرض الخريطة

بيانات عن الآلة

وصف الآلة:
متجر الطلاء
المصنّع:
Pony Luxury Coating
الموديل:
Pony L11000 (11x5x5)
سنة الصنع:
٢٠٢٥
الحالة:
جديد
الوظائف:
يعمل بكامل كفاءته

السعر والموقع

الموقع:
Schulstr 3, 97084 Würzburg, DE ألمانيا
اتصل

بيع الآلات

هل وجدت آلة جديدة؟ الآن حوّل القديم إلى مال.
هل وجدت آلة جديدة؟ الآن حوّل القديم إلى مال. احصل على أفضل سعر من خلال Machineseeker.
المزيد عن بيع الآلات

تفاصيل فنية

الارتفاع الكلي:
٥٬٦٠٠ مم
الطول الكلي:
١١٬٢٠٠ مم
العرض الكلي:
٥٬١٠٠ مم
نوع تيار الإدخال:
ثلاثي الطور
مدة الضمان:
٢٤ شهور
ارتفاع داخلي:
٤٬٩٧٠ مم
الطول الداخلي:
١١٬٠٠٠ مم
درجة الحرارة:
٨٠ °C
العرض الداخلي:
٥٬٠٠٠ مم
متطلبات الهواء:
٥٢٬٠٠٠ م³/س
جهد الدخل:
٣٨٠ V
قدرة التسخين:
٢٥٠ كيلوواط (٣٣٩٫٩١ حصان)
قدرة:
٤٥ كيلوواط (٦١٫١٨ حصان)
وقود:
غاز بترول مسال (LPG)
استهلاك الطاقة:
٤٥ كيلو واط ساعي
تردد:
٥٠ هرتز
سُمك العزل:
٥٠ مم
القدرة الاسمية:
٢٥٠ كيلوواط (٣٣٩٫٩١ حصان)
السماكة القصوى لصفيحة الفولاذ:
٢ مم
معدات:
إضاءة

تفاصيل العرض

معرّف القائمة:
A19572531
التحديث الأخير:
في ٠٧.١٠.٢٠٢٥

الوصف

* Air Preparation Unit:
The air preparation unit is a recirculation system that supplies the cabin with filtered fresh air and exhausts used air during the painting process. It heats the air to 60 °C, mixes the used air with 10% fresh air via an automatic multi-damper system, and reheats the air before routing it back into the cabin. The air is heated using a burner and a heat exchanger, both made of high-quality 304 stainless steel and housed within the fresh air unit. During painting, the air is filtered twice (via front and ceiling filters) before it enters the cabin. The contaminated air is also filtered twice (through inlet and outlet filters) before it exits via the exhaust unit. Air preparation units are insulated like the side walls to minimize heat loss and are protected against potential vibration and noise thanks to rubber seals on the covers. The exhaust air is regulated by a damper in the outlet duct, which helps control the internal pressure of the cabin.

* PRINCIPLES OF CABIN OPERATION:
The processes in the cabin are controlled via a control panel that manages the following steps:

* PAINTING PROCESS:
During painting, 100% fresh air is drawn in from outside and passed through front filters before entering the distribution chamber at ambient temperature. The air is then expelled by the extraction unit. Floor filters (paint stops) capture paint particles, and the air passes through the final exhaust filters before being discharged.

* FLASH-OFF PROCESS:
After painting, the cabin operates for approximately 15 more minutes to purge residual solvents and thinners. During this phase, fresh air from outside continues to circulate in the cabin.

* DRYING PROCESS:
In this phase, 80% of the air passing through the cabin is heated to 60 °C and supplied to the cabin via a distributor. As 20% of the solvent is released during drying, these solvents are expelled with the exhaust air. Industrial coatings are typically dried at 60 °C, but the cabin temperature can be adjusted via the control panel as required.
Dcsdpswzl Hxjfx Agqsn

* COOLING PROCESS:
After the 30-minute drying process, the coil is deactivated via the control panel, the pneumatic damper closes, and the extraction system restarts. During the 5-minute cooling phase, fresh air from outside circulates in the cabin, after which the system stops automatically.

ELECTRICAL AND ELECTRONIC EQUIPMENT:
These control panels manage the functions and operation of all machinery and devices inside the cabin. The control panel is constructed from durable galvanized sheet metal and steel profiles and is fully enclosed to protect against dust and moisture.
Electrical devices and control panels:
• The control panel contains essential components such as circuit breakers, fuses, indicator lamps, thermal relays, contactors, and connectors.
• Heat-resistant cables are used for command and control lines between the panel and motors or other electrical devices.
• Electrical wiring is designed to allow for cabin relocation if necessary.
• Operating devices use 380 V 50 Hz, while control devices use 220 V.

تمت ترجمة الإعلان تلقائياً، وقد تكون هنالك بعض الأخطاء في الترجمة.

مستندات

19572531-01.pdf (PDF)

مورد

اتصل

تقديم الطلب

أرضus 
ألمانيا
النمسا
سويسرا
الولايات المتحدة الأمريكية
المملكة المتحدة
فرنسا
بلجيكا
إسبانيا
المكسيك
إيطاليا
هولندا
بولندا
الاتحاد الروسي
بيلاروس (جمهورية بيلاروس)
أوكرانيا
إستونيا
تركيا
نيوزيلندا
أيرلندا
جمهورية التشيك
الدانمارك
فنلندا
السويد
النرويج
لوكسمبورغ
اليونان
ليتوانيا
لاتفيا
آيسلندا
البرتغال
البرازيل
فنزويلا
الأرجنتين
المجر
سلوفاكيا
رومانيا
مولدوفا
سلوفينيا
صربيا
الجبل الأسود
ألبانيا
كرواتيا
بلغاريا
مقدونيا الشمالية
البوسنة والهرسك
إسرائيل
مصر
المغرب
الهند
إندونيسيا
كوريا الجنوبية
اليابان
تايلاند
ماليزيا
فيتنام
China
تايوان
إيران
بنغلاديش
أفغانستان
ملاحظة: سيتم إرسال طلبك إلى جميع البائعين في فئة الماكينات. وبهذه الطريقة يمكنك الحصول على العديد من العروض.
تعذر إرسال الطلب. يرجى المحاولة مرة أخرى لاحقًا.

الهاتف & فاكس

+49 176 7... إعلانات